Permits - General Information

PERMITS

How to Apply for a Building or Fire Permit 

Licensing & Verification Requirements

Before a Permit Can be Issued:

1. All licensing must be verified and up to date for the person performing the work

  • Contractors: Must hold a current, active license with the California Contractors State License Board (CSLB) appropriate for the scope of work.
  • Business License: A current City of West Sacramento business license is required. You can apply or renew online via the West Sac Services Portal.
  • Owner-Builders: If the property owner is acting as the builder, a completed Owner-Builder Disclosure Form must be provided.

2. The future tenant must have applied for a City of West Sacramento business License, or ensure their license is current

  • Contact the Business License Divisions for any questions by e-mail, phone or in-person during counter hours. 
    • E-Mail: buslic@cityofwestsacramento.org
    • Phone: 916-617-4645 Option 2
  • Application or renewal can be done online through the West Sac Services Portal

Over-the-Counter (OTC) or Non-Structural Permits

Over-the-counter (OTC) permits can be applied through our West Sac Services Portal

West Sac Services Portal

Types of Permits that can be applied for through the Portal are listed below.  The following will be required to be provided:

  1. An area of work plan showing the existing layout and the proposed scope of work.  

  2. Ensure the area of work plan is clearly labeled and signed by the designer.  

  • OTC Dry Rot: Residential or multi-family dry rot repair that does not include any framing repair.   

  • OTC Electrical: Panel change or upgrade, re-wiring of a home, residential EV charger install, and or battery that do not require trenching or modification to the site. 

  • OTC Mechanical: New or change out, of HVAC, heat pump, and mini-split, and associated elements (condenser, coil replacement, ducting etc).  

  • OTC Plumbing: water line replacement (after the meter to the house), addition or altered plumbing for residential, duplex, or multi-family, sewer line replacement, drain line repair or replacement, gas line additions or repairs. 

  • OTC Remodel Minor: Kitchen or bathroom remodels that do not change the floor layout, and includes any plumbing work.  Window change out or repair.    

  • OTC Re-roof: Commercial, multi-family, duplex, residential re-roof of only roofing material.  

    For Commercial or multi-family approval from the Yolo County Air Quality District will be required.  

  • OTC Stucco: Replacement of existing stucco.  

    1-coat system requires ICC listing for product and certification confirming the contractor is an approved applicator. 

  • OTC Water Heater: Water heater change out, gas or electric.

  • Residential General: Residential solar panel (photovoltaic, PV) install or alteration.  Required: Site plan, single line electrical diagram, PV module, invert specifications, equipment mounting specs, signage, and designer signature. 

    If plan check is required, the review timeline is 5 - 10 business days, and is subject to change based on volume.   

 

 

Permits Requiring Full Plan Review (Non-OTC)

Standard Permit Submissions

If your project cannot be issued Over-the-Counter (OTC), you must submit your application by email. This includes projects like new construction, additions, structural alterations, patio covers, fire sprinklers, fire alarms and tenant improvements.
 
Submission Checklist:
  1. Building Permit Application: Fill out the form completely.
  2. Construction Plans: Attach all relevant architectural and or engineering drawings and supporting documents. Please review the checklist on our website for a complete list of required items for your specific scope of work.
  3. Email: Send your completed package to: buildingpermits@cityofwestsacramento.org

If your files are too large to email, we can provide a OneDrive link instead. 

Plan Check Process Overview

Plan Check Process Overview

1. Routing & Initial Review

Depending on the submittal type, plans will be routed to the applicable internal divisions and external agencies:

  • Internal Divisions: Building, Engineering, Planning, Fire, and Recycling/Sustainability.
  • External Agencies: Air Quality, Yolo County, and the Health Department.
2. Review Outcomes & Notifications

As each reviewing division completes its assessment, one of two outcomes will occur:

  • Approved: If a division approves the plans, the process moves forward toward final invoicing (see Step 6).
  • Corrections Required: A correction letter will be uploaded to the West Sac Services Portal. An automated email will notify the contact to check the portal. Note: You do not need to be signed in to view the letter.
3. Review Completion

Once all divisions have completed their reviews, you will receive a final email notification signaling that you may now resubmit your plans.

4. Resubmittal Requirements

When resubmitting, you must provide:

  • A line-by-line response to each correction letter.
  • Clear notation of where the changes were made.
  • A complete, full set of the revised plans and or documents.
  • Timeline: Subsequent reviews take 10–15 business days.
5. Plan Check Fees

The initial plan check fee covers the first three review cycles. If a project requires a 4th cycle or beyond, additional reviews will be billed hourly.

6. Approval & Permit Invoicing

Once the submittal is fully approved by all departments, the remaining permit fees will be invoiced. This balance must be paid in full before the permit can be issued.

7. Payment Options

Payments can be made through four convenient methods:

  • Online: Pay via the West Sac Services Portal. Registration is not required to pay, but a 3% transaction fee applies.
  • In Person: Pay at the counter during counter hours (Monday–Friday, 9:00 AM–5:00 PM).
  • By Mail: Send payment to the address below. Always reference your permit number(s) on the check or documents:

    Building/Permitting Division, Community Development
    1110 West Capitol Ave, 2nd Floor
    West Sacramento, CA 95691

  • Wire Transfer: Contact the Permit Center directly for wire instructions.
8. Licensing & Verification Requirements

Before a permit can be issued, all licensing must be verified and up to date:

  • Contractors: Must hold a current, active license with the California Contractors State License Board (CSLB) appropriate for the scope of work.
  • Business License: A current City of West Sacramento business license is required. You can apply or renew online via the West Sac Services Portal.
  • Owner-Builders: If the property owner is acting as the builder, a completed Owner-Builder Disclosure Form must be provided.

 


West Sac Services Portal

West Sac Services Portal

Welcome to the City of West Sacramento Services Portal. Managing your projects, permits, and city services is now simpler than ever. Submit applications, track progress, and pay fees online—anytime, anywhere.
 
For the Best Experience: Before you begin, please use a desktop or personal computer. The West Sac Citizen Access Portal is optimized for Google Chrome and does not currently support mobile devices or alternative browsers.
 
Quick Navigation Guide:
  • No Login Required: You can instantly check a permit status or make a secure payment without creating an account.
  • Account Required: You will need to log in to apply for building permits, submit or renew a business license, or schedule required building inspections.
  • Explore More: Use the main Menu to quickly search city records, manage your public profile, sign up for local alerts, or access step-by-step guides in our Help Center.

Check Permit Status

Visit the West Sac Services Portal You do not need to log into your account to check status or make payment.


How to make Payment

A 3% convenience fee will be added to transactions paid online.

Download the step-by-step instructions on How to Make Payment(PDF, 2MB)  via the West Sac Services Portal.

 

 

How to Download or Upload Documents

Download the step-by-step instructions on How to Download or Upload Documents(PDF, 1MB)  via the West Sac Services Portal.


Review Outcomes & Notifications: As each reviewing division completes its assessment, one of two outcomes will occur:

  • Approved: If a division approves the plans, the process moves forward toward final invoicing.
  • Corrections Required: A correction letter will be uploaded to the West Sac Services Portal. An automated email will notify the contact to check the portal. Note: You do not need to be signed in to view the letter.

Resubmittals: Can be submitted directly to the portal by uploading documents or by e-mail to: buildingpermits@cityofwestsacramento.org

To resubmit, you must have a West Sac Services account that is linked to your permit. If you are not currently linked, please contact Permit Services to get set up.

 

 

 

 

 


Permit Basics & Guidelines

Building Permit Application & Owner/Builder Disc. Form

Every Building and Fire permit submittal requires a completed Building Permit Application.

Applying as an Owner-Builder? You will also need to submit the Owner/Builder Disclosure form with your application.

Extend or Renew A Permit or Application

Request an extension for an active application/ permit or reactivate an expired one.

Construction and Demolition Diversion Requirements - Recycling Part 1 & 2

Recycling Part 1: Must be submitted with a complete building permit application

Part 1 includes the Construction and Demolition (C&D) recycling requirements, agreement, a list of permitted haulers and approved sorting facilities. 

Recycling Part 2: Must be submitted prior to scheduling a building final

Part 2 is to be submitted once all debris has been disposed, along with documentation to the e-mail on the form. 

Visit the Sustainability C&D page for more information.

Special Inspection and Testing Agreement

Special Inspection & Testing Agreement with list of City approved special inspection agencies
Signature Requirements:
To complete this form, signatures are required from all four of the following parties:
  • Registered Design Professional
  • Property Owner
  • Contractor
  • Approved Special Inspection Agency
Tip: If you cannot gather all signatures on a single page, you may submit multiple copies of the form signed by different parties.

Design Professional Requirements

Professional design and stamped plans are required for specific project types to ensure safety and structural integrity
  • Requiring an Architect or Engineer 

 

 

Exempted Construction from a Permit

Fee Schedules

School Impact Fee Rate

Effective August 26, 2024, Washington Unified School District has increased developers fee to $0.84 per square foot for Commercial/Industrial and $5.17 per square foot for Residential. 

Fees Adjustments will go into Effect November 1, 2025

The Community Development and Fire Departments are adjusting the user fees for many services and permits. The updated fees were recently approved by the City Council and are associated with Building, Planning, Development Engineering, Code Enforcement, Sustainability and Fire Prevention. Please note that development impact fees and fees collected on behalf of other agencies (such as the Washington Unified School District and Yolo County) were not included in this update.

The fee adjustments will go into effect on November 1, 2025.  Fee adjustments were necessary to cover costs and focus on continued improvements to provide customers with ongoing excellent service.

New fee schedule download: Community Development & Fire Prevention Effective November 1, 2025

For Building Division fees download: Building User Fee Schedule Effective November 1, 2025

The City of West Sacramento complete Book of Fees Schedule for download: Book of Fees

Tiny Homes on Wheels Impact Feed Reduced

At the April 15, 2026, meeting, the West Sacramento City Council unanimously approved a new interim program to reduce development impact fees for Tiny Homes on Wheels (THoWs) used as primary residences. The interim program is designed to better align fees with the smaller size and lower infrastructure demand of these homes (typically 150 to 399 square feet) rather than applying impact fees intended for traditional, larger single-family housing. With the adoption of this interim program, the City will scale impact fees proportionally ensuring consistency with State law. The interim program also introduces a flexible payment plan option, allowing applicants to pay fees over time.

The updated impact fees download: Impact Fees (Book of Fees effective 4/15/26)


Unpermitted Work

City ordinances and state statutes require building permits. If you do not get a building permit when it is required, the city can legally fine you for the violation. The permit and accompanying inspections are to ensure you that the work is up to code and safe. Projects not done according to code can affect your home's insurability and potential future sale. Prospective buyers can check the city's building records.

Work that was done without obtaining required permits is a violation of the State Building Code and is considered illegally constructed work. There are no statutes of limitation on illegal construction. If any work has been done illegally in the past or if change of ownership has occurred this does not make the non-permitted work legal.

In order to legalize the work, you must comply to the current codes regardless when the construction was done. See the Unpermitted Structures Built Without a Permit Policy.

A homeowner, their agent, and/or contractors licensed by the State of California can obtain building permits. It is recommended that a licensed contractor conduct work on your project. You can research information on any contractor by logging onto the Contractors Licensing Board's Website or you may contact them at (800) 321-CSLB (2752).

 

 

 

Yolo County Health Pre-Approval for Sites on Well and or Septic

Notice for Parcels on Well and or Septic Systems
Before submitting a building permit application, you must secure pre-approval from Yolo County Environmental Health (YCEH). This applies to any construction affecting wells (setbacks and standards) or septic systems (additions, ADUs, new bedrooms, or increased plumbing that changes the volume of type of wastewater).

 

Demolition - Building Demo & Disconnection of Utilities

Demolition Permits

Required for all structures exceeding 120 sq. ft. Each structure requires a separate permit, though multiple structures can share the same site plan.

Building & Structural Design Criteria

  • Building and Structural Design Criteria 

Gas Piping Sizing

Natural Gas Piping: Sizing & Inspection
Technical specifications for sizing natural gas lines safely. Includes installation requirements, inspection safety protocols, and a Sample Gas Pipe Sizing Chart.

 

How to submit Revisions or deferred submittals

 

City Ordinances

  • 2022 Ordinance 22-20
    2022 Ordinance and adoption of 2022 California Building, Fire, Mechanical, Plumbing, Electrical, Residential, Energy, Green Building and International Property Codes and amendments.

  • Electric Vehicle Charging Systems Ordinance 17-16

  • Electric and Barbed Wire Fencing Ordinance 14-8