Residential Permits

Independence .jpeg

Required for residential alterations to existing structures

Solar APP+

SolarAPP+ Automated Solar Plan Reviews

ATTENTION: Construction plans are required on-site for all inspections. If plans are missing or unavailable, your inspection will automatically fail and a re-inspect fee will be assessed.

Before applying for an automated solar plan review and solar permit, projects must follow certain requirements. At this time, SolarAPP+ is designed to provide a code-compliance check for the majority of residential, roof-mounted, retrofit photovoltaic systems. To see which systems are eligible, please refer to the Eligibility Checklists. Only projects that conform to these lists are eligible to use the automated SolarAPP+ portal for instant permitting.

1. How to Start using SolarApp+

2. Submit for automated review through SolarAPP+

  • To start using SolarAPP+, log in and submit your design through the SolarAPP+ Webpage.

  • A processing fee from SolarAPP+ and City of West Sacramento permit fees will be charged.

  • Once approval number is given, submit permit through West Sac Portal

3. Apply for Permit through City of West Sacramento

  • Visit West Sac Services Portal.

  • Click login or register to get started.

  • Accept the terms of service, and select "residential general"

  • Click continue and follow the prompts.

    • you will need your solar app approval number, approval document, and spec sheets to upload during this process.

  • Follow the prompts to make payment and accept the conditions of the permit. 

  • Once complete, you will be provided with your permit number and immediately be able to download your job card. 

  • Download the Job Card and have your SolarAPP+ Inspection Checklist onsite for inspections. 

4. Schedule an Inspection:

Construction plans are required on-site for all inspections.  If plans are missing or unavailable, your inspection will automatically fail, and a re-inspect fee will be assessed.   

Solar App+ Tutorial

 SolarAPP+ Introduction and Technical Demonstration

 

Accessory Dwelling Units (ADU)

Accessory Structure

Bathroom Remodel - Residential

Gas Piping Sizing

Natural Gas Piping: Sizing & Inspection
Technical specifications for sizing natural gas lines safely. Includes installation requirements, inspection safety protocols, and a Sample Gas Pipe Sizing Chart.

 

 

Electrical Vehicle Charging System - Residential

Conventional Framing & Bracing

Garage Conversion - Residential

HVAC Split System Attic Installation - Residential

Kitchen Remodel - Residential

Manufactured Home

Solar Photovoltaic Systems - Residential

  1. SOLARAPP+ Submit anytime, 24/7, the approved checklist and pay the fee via Citizen Access Portal (ACA).   Select permit type RESIDENTIAL GENERAL, and select SOLARAPP in the application.  
  2. Apply through Citizen Access Portal (ACA), select permit type RESIDENTIAL GENERAL, and submit plans.  Plan check is around 10 -15 business days.  
  3. E-mail a complete application to us at buildingpermits@cityofwestsacramento.org.  Processing time varies, and plan check is 10-15 business days.  

 

 

Permit submittals and plans that require an Architect or Engineer

 

  • AB2234 Plan Submittal Requirements for post-entitlement phase permits 
    In compliance with AB2234, information regarding submittal requirements for post-entitlement phase projects that are majority or completely residential. This can include, Single Family, ADUs, Duplexes, Townhomes, and Multi-Family Projects. 
  • Accessible Parking 
  •    
  • Accessory Dwelling Units (ADU) - Itemized Valuation Required with Submittal
  • Accessory Structures - Attached & Detached - Itemized Valuation Required with Submittal
  • Bathroom Remodel - Residential
    Important requirements for residential bathroom remodel projects.

  • Building & Structural Design Criteria 2025 California Building Codes 

  • Commercial Tenant Improvement Checklist - Itemized Valuation Required with Submittal

  • Conventional Framing & Bracing
    Information on light wood-frame conventional construction. Braced panel & nailing schedules

  • Demolition & Disconnection of Utilities - Pre-site inspection required
    Building Demolition requirements. Contact information for Yolo Solano Air Quality and Recycling & Parks Divisions.

  • Electric Vehicle Charging System - Residential
    Information on obtaining a permit for residential electric vehicle charging systems.

  • Electric Vehicle Charging Systems - Commercial

  • Emergency Egress
    Residential escape and rescue window information.       

  • Exempted Work from Permit  

  • Garage Conversion - Itemized Valuation Required with Submittal
    Plan submittal checklist for converting a residential garage to habitable living space.

  • Gas Piping Sizing
    Information on determining the correct sizing for natural gas piping. Installation and inspection requirements. Includes a sample sizing chart

  • HVAC Split System Attic Installation (Residential)
    An installation checklist for attic installed split system HVAC units. Information on attic access, required platforms, venting clearances, etc.

  • Inspection Requirements
    Information and requirements for construction inspections.

  • Inspection Requests
    Information on Requesting Inspections for issued permits.

  • Kitchen Remodels Residential
    Checklist and information on plan submittal for kitchen remodels.

  • Manufactured Home Inspection
    Information on required inspections when installing a manufactured home.

  • New Commercial Buildings & Additions - Itemized Valuation Required with Submittal
    Plan submittal checklist and information for new commercial and industrial buildings and new commercial additions.

  • New Multi-Family Buildings - Itemized Valuation Required with Submittal
    Plan submittal checklist for new multi-family residential and mixed-use buildings.

  • New Single Family Dwelling - Itemized Valuation Required with Submittal
    Plan submittal checklist and requirements for new single-family residential dwelling unit.

  • PASS Project Submittal Checklist

  • Patio Covers - Residential Attached
    Illustration examples and information on developing drawings for attached patio covers.

  • Photovoltaic Checklist
    Plan submittal requirements for photovoltaic systems.

  • Plot Plan Example
    Example of a site plan or plot plan required for permit application.

  • Re-Roof Procedure and Inspection Requirements
    Requirements and procedures for re-roof inspections.       

  • Residential Addition Checklist

  • Residential Care Facility Guidelines

  • Residential Re-Roof Energy Compliance Form
    This form is required to be completed whenever a residential roof is installed.

  • Residential Window Change Out - Like for Like
    Information on obtaining a permit for residential window replacement when the size of the opening is not being changed.

  • Roof Repitch
    Plan submittal checklist for changing the pitch of an existing residential roof.

  • Water Conserving Plumbing Fixtures
    Information on Senate Bill 407 which requires water-conserving plumbing fixtures. Self-certification form included.

  • Signs
    Plan submittal requirements for signage.

  • Storage Racks - Itemized Valuation Required with Submittal
    Information on Storage Racking requirements.

  • Swimming Pools & Spas - Itemized Valuation Required with Submittal
    Plan submittal requirements and information on inspections & safety features.

  • Water Heater Installation - Residential
    Requirements for installation of a Residential water heater