Plug-In Partnership Program

Sales of electric vehicles is growing around the world, with the number of electric vehicles increased from 17,000 in 2010 to 7.2 million by 2019. The Plug-In Partnership Program supports increasing adoption and use of zero emission vehicles through the consideration of installation of electric vehicle (EV) charging stations, deployment of demonstrations zero-emission vehicles (ZEVs), and collaboration with local fleet-operating stakeholders to transition to EV.

The City is partnering with ChargePoint, an electric vehicle infrastructure company, to consider the feasibility and capacity to install publicly available EV Charge Stations at the following sites:

  • City Hall (1110 Capitol Ave)
  • Community Center (1075 Capitol Ave)
  • Joey Lopes Park (840 – 878 Sycamore Ave)
  • Heritage Oaks Park (1300 Lake Washington Blvd)
  • Corporation Yard (4300 West Capitol Ave)
  • Bridge District Parking Lot (74 Bridge Street)
  • Lighthouse Charter School (899 Bryte Ave)
  • Alabama & 15th Parking Lot
  • 3rd and D Street Curbside Parking
  • Elkhorn Plaza Curbside Parking
  • 7th St and Tower Bridge Gateway/Christopher L. Cabaldon Parkway Parking Lot

More information

Frequently Asked Questions

What are electric vehicles?

Electric vehicles that are either partially or fully powered on electric power. There are several different types of electric vehicles available on the market:

  • Hybrid Electric Vehicles – operates on both gasoline and electricity, with the electricity generated primarily from the vehicle’s own braking system through regenerative braking
  • Plug-in Hybrid Electric Vehicles – operates on both gasoline and electricity, and can generate electricity through regenerative braking, but also provides the additional option of recharging by plugging into an external source of electricity
  • Battery Electric Vehicles – relies solely on electricity stored in on-board batteries that are charged by plugging in to an external source of electricity, though some regenerative braking is also possible

 

What kinds of public electric vehicle charging infrastructure exists in West Sacramento?

There are approximately 20 publicly available charging stations throughout the City. Approximately three-quarters of those chargers are level 2 chargers, while the remaining are level 3 chargers. Out of all the stations, the City owns and operates 3 dual port level 2 charging stations (6 chargers) at City Hall and the Bridge District Parking Lot. Most of the public chargers are concentrated in the denser parts of the city to the north.

With the Plug-In Partnership Program, the City will add/replace 26 dual-port L2 stations, 10 single-port L2 stations, and 12 single-port DCFC stations.

More information

 

How much does it cost to charge my electric vehicle?

On May 3, 2023, the City Council approved fees and policies for City-owned EV chargers. Effective July 3, 2023, the EV charging fees and policies are as follows:

Charging Type Fee Time Limit Overstay Fee*
Level 2 While charging: up to $0.35/kWh

3 hrs at Lighthouse Charter School

4 hrs at all other sites

$0.50/min after 4 hours or fully charged
Level 3 While charging: up to $0.45/kWh 30 minutes

$0.50/min after 4 hours or fully charged

 

*Grace period of 10 minutes when vehicle fully charged or after the posted charging time limit, whichever comes first.

For City-operated charging stations, please visit www.westsacpark.org.

For non-City operated charging stations, please consult the respective EV charging network operator or site host.

 

Is there a time limit for using a charging station?

Currently, charging station time limits depend on the site. City Hall has two stalls with 4-hour charging limits accessible to the public 5PM - 8 AM, weekends, and holidays. The Bridge District parking lot does not have any charging time limits, but parking fees may be required to use the parking lot. 

On May 3, 2023, the City Council adopted EV charging fees and policies. Charging time limits will be posted at each site, and effective July 3, 2023 is generally as follows:

  • 3 hours at L2 stations at Lighthouse Charter School
  • 4 hours at L2 stations at all other locations
  • 30 minutes at DCFC stations

More information

 

Why is the City funding this program?

Longstanding concerns around carbon dioxide and other Greenhouse Gas (GHG) emissions has motivated technological development in alternatives to conventional gasoline powered vehicles. This program addresses mobility needs, while also improving air quality and reducing pollution to our ecosystems. EVs benefit both the environment and the economy. By using electricity rather than gasoline, EVs produce less greenhouse gas emissions and reduce our carbon footprint.

 The availability of charging infrastructure gives drivers confidence that they would be able to charge their vehicles while away from home. The uncertainty of being able to complete a trip before needing to charge has been an impediment for EV adoption. This is often referred to as “range anxiety.” Accessibility and convenience of charging equipment is essential and can encourage drivers to adopt EVs.

This effort is consistent with the City’s commitment to California’s near-term GHG reduction goal of 40% reductions below 1990 levels and the Mayors’ Commissions on Climate Change to achieve carbon zero by 2045.

 

How is the Plug-In Partnership Program funded?

The program is funded by the Sacramento Area Council of Government’s Green Region Grant in the amount of $2,665,000. ChargePoint partnered with the City and will provide a discount on consultant services and equipment to meet the match required for the Green Region Grant.

 

City Council and Commission

2023.05.03 - Council - PUBLIC HEARING AND CONSIDERATION OF RESOLUTION 23-30 ADOPTING ELECTRIC VEHICLE CHARGING FEES IN THE CITY BOOK OF FEES

 2023.05.03 - Council - CONSIDERATION OF AWARD OF CONTRACT WITH FREEWIRE TECHNOLOGIES FOR ELECTRIC VEHICLE SUPPLY EQUIPMENT, AMENDMENT NO. 3 TO KIMLEY-HORN AND ASSOCIATES PROFESSIONAL SERVICES CONTRACT, AND ADOPTING RESOLUTION 23-36 AMENDING THE CAPITAL IMPROVEMENT PROGRAM BY ALLOCATING $109,000 FOR THE CITY OF WEST SACRAMENTO’S PLUG-IN PARTNERSHIP PROGRAM (CIP 11036)  

2023.05.01 - TMI Commission - PRESENTATION ON PROPOSED ELECTRIC VEHICLE CHARGING FEES IN THE CITY BOOK OF FEES FOR CITY COUNCIL CONSIDERATION

2023.02.15 - Council - CONSIDERATION OF CONSTRUCTION CONTRACT AWARD TO QUANTUM ENERGY SERVICES & TECHNOLOGY, INC. FOR THE WEST SACRAMENTO ELECTRIC VEHICLE (EV) CHARGING STATION INSTALLATION PROJECT (CIP 11036)

2022.07.20 - Council - CONSIDERATION OF AWARD OF CONTRACT WITH REXEL ENERGY SOLUTIONS FOR CHARGEPOINT, INC.’S ELECTRIC VEHICLE SUPPLY EQUIPMENT FOR THE CITY OF WEST SACRAMENTO’S PLUG-IN PARTNERSHIP PROGRAM (CIP 11036)

2022.06.01 - Council - CONSIDERATION OF APPROVAL OF CONTRACT AMENDMENT NO. 1 WITH KIMLEY-HORN AND ASSOCIATES, INC. FOR ADDITIONAL WORK RELATED TO THE PLUG-IN PARTNERSHIP PROGRAM

2021.09.15 - Council - CONSIDERATION AND AWARD OF PROFESSIONAL SERVICES CONTRACT TO KIMLEY-HORN AND ASSOCIATES, INC. FOR THE DESIGN OF ELECTRIC VEHICLES (EV) CHARGING STATIONS (PLUG-IN PARTNERSHIP PHASE 1)